Allworks was engaged to address a compliance gap at 22 Giffnock Avenue by designing and constructing an accessible lift overrun cover to ensure protection from environmental exposure. The lift services a government tenancy, requiring urgent rectification works to align with safety and DDA regulations.
The project began with a design consultation and engineering assessment to ensure structural adequacy and compliance with BCA requirements. From there, Allworks manufactured a custom steel framed housing with a polycarbonate awning that matched the site’s architectural intent.
Installation occurred within a constrained operating environment with live tenant access and strict noise limits. Our team used prefabricated elements and non-intrusive fixings to reduce install time and avoid site downtime.
Completed within days, the solution provided immediate compliance assurance and functional weather protection, all within a tightly managed budget.